SCULPTURE PLINTHS GOING IN!

SCULPTURE PLINTHS GOING IN!

We have begun the process of installing bases at the Sculpture Forest for sculptures needing them.  First two just went in, with more on the way.  Fortunately, other sculptures do not need concrete bases or sculptors can bring their own plinths that already match their sculptures.  For those...

TREE CLEARING FOR PARKING LOT

TREE CLEARING FOR PARKING LOT

Today was a hard day to watch, though it was necessary.  When designing the two loops of the main trails, it was intentionally routed so that only a few small 4 inch diameter trees had to be removed along the entire trail system.  The trails work within the forest, and they continuously flow...